中山市佑玛电器有限公司

壁挂炉生产厂家

News

Your current location:

Home >> News >> Company news

Cb wholesale and let you enjoy comfortable home life

Date of publication:2019-07-01 Authors:佑玛 Click:


     

Two or more of wall-mounted boiler heating season without interruption. Compared with a boiler, wall-mounted boiler used in the gas quantity increased. Wall-mounted boiler heating time increased, the heat from the hot water cooling, hot water cut per unit time. The voice of wall-mounted boiler increased and abnormal noise from time to time.




The water in the radiator often should not change




Scale is the major problems affecting wall-mounted boiler efficiency and service life。 However, this does not mean that the water often need to change the radiator。 The specific reason is that each change can bring a lot of water and alkali water, accelerate the formation of scale。 Cb wholesale expert proposal, a year later will be dirty water draining, and inject new water, again in a few years will be replaced。 After the heating season, if the cleaning and maintenance, only need to separate wall-mounted boiler。

壁挂炉批发

  

Don't add antifreeze




In a wall-mounted boiler system can not add any chemicals, especially the antifreeze. Cb wholesale users should according to the condition of the home also correctly to prevent freezing. Heat at the same time, it is suggested that the residents can configure the temperature controller, a more reasonable planning a wall-mounted boiler status. When away from home during the day, can use low temperature heat, should be timely after go home. Enjoy a comfortable home life. But, for security reasons, if you don't use for a long time, you must cut off the gas after emptying system and power supply.




Scaling principle and harm of wall-mounted boiler: is the core issue of wall-mounted boiler heat efficiency and service life, the major factors that affect these two aspects is the scale problem. Especially when we use the hot water, we need to constantly add new water, in most of the water quality is difficult to, which greatly increase the rate of the heat exchanger fouling. As attached on the inner wall of the heat exchanger on the thickening of scale continuously, the diameter of the heat exchanger thinning, the flow is not smooth, not only increase the burden of the pumps and heat exchangers, and wall-mounted boiler in thermal efficiency. It will also be greatly reduced, gas consumption increase is mainly due to the wall hung boiler, heating, hot water in the hot and cold water and hot water. If the boiler heat transfer components under the condition of the high load running, the boiler's damage is very serious.




The influence of impurities and scale of radiator boiler: wall-mounted boiler water circulation in heating system in。 Because the water contains impurities and acidic, radiator and pipeline internal there will be some corrosion。 We use most of the radiator is made of cast iron。 During the installation process, sand residues and other impurities in the radiator cannot be completely washed away。 In addition, the water in the heating system is always closed, boiler heating part is no filter, so the radiator and the rust of slag and water in the pipe itself of the impurity will once again into the heat exchanger by wall-mounted boiler circulating pump。 These impurities under the condition of high temperature continuous decomposition, and some of them become scale adhesion。 The inner diameter of the heat exchanger more thin。 Circulating pump pressure further increase, therefore, the long-term operation will make wall-mounted boiler circulating pump speed to reduce congestion, even seriously affect its service life。

 


Website of this article:http://en.hzyinyou.com/news/436.html

Case

The high quality case

  • Service
  • Contact
    13560697509
  • Meeage
  • Welcome
    Please enter your message here.
    Name
    Name
    Tele
    Tele
    mailbox
    mailbox
    address
    address
    篮球比分 ope体育 火红彩票 篮球比分 大乐透走势图 大乐透走势图 博牛社区 中国福彩网 脱兔电竞 360彩票网 炸金花 博牛论坛 500万彩票 山东11选5 广东快乐十分走势图 广东11选5走势图 内蒙古快3 彩客网 彩客网 皇冠足球比分 足球彩票 懂球帝 皮皮麻将 福彩3D综合走势图 大乐透复式计算器 凤凰棋牌 天天斗地主 波克棋牌 大神棋牌 欢乐棋牌 黑龙江快乐十分 彩票万能选号器 四人斗地主 王者荣耀赛事竞猜 江苏11选5 足彩胜负14场 篮球论坛 玩加电竞 腾讯棋牌 竞猜网 秒速赛车_永久网址9h123.com - 水立方冰场转换结构上午完工-中新网 秒速赛车_上9号363758.com - 人民网