中山市佑玛电器有限公司

壁挂炉生产厂家

Product

Your current location:

Home >> Product >> Water heater burning gas

home in Wall hanging furnace

  • Detailed

NSK.jpg

欧洲.jpg

18.jpg

1555394817574471.jpg

1555394821127472.jpg

Home in Wall hanging furnace


Hanging furnace manufacturers share to you in Wall hanging furnace filling, filling water drainage operation method and system


Saso wall-mounted gas furnace, the closed loop system, in order to ensure the normal operation, must want to come to cb before use and fill the water in the heating system. In addition, the operation process, due to evaporation of water vapor in the water can also cause the water pressure is too low and needs filling water. Share below, wall-mounted boiler manufacturers will give you hanging furnace water injection, operation method of filling water and drainage system.


How to hanging furnace water injection?


When you first use in Wall hanging furnace saso tamar, cb or when you don't use for a long time, but will it assure the boiler heating system and the internal empty, want to use the equipment again when the need for water injection operation。 Special remind, when water injection operation by technicians。


First, open the discharge valve


Water injection before open the circulating water pump on the automatic exhaust valve and the exhaust valve on heating system terminal equipment。


Second, the open the wall hanging furnace water injection valve, check the pressure of heating system


Water filling water valves with the hand press counter-clockwise to stop, water injection valve is in open state, the tap water to filling water heating system (clockwise to close the valve)。 Observe the hydraulic pressure gauge on the operation panel, when the pointer at 1 bar to 1。5 bar, stop pouring。


Third, the test run, to the system stable operation


Water injection, due to the air in the system as a row, when running the water pump, the residual air enters the water pressure test system, with the current caused by water shortage protection, quote us E8 fault, just at this time the system hydraulic fill between 1-1.5 bar, manual reset or boot can restart again. Repeatedly, until the system runs stably.


Website:http://en.hzyinyou.com/product/571.html

Case

The high quality case

  • Service
  • Contact
    13560697509
  • Meeage
  • Welcome
    Please enter your message here.
    Name
    Name
    Tele
    Tele
    mailbox
    mailbox
    address
    address
    篮球比分 ope体育 火红彩票 篮球比分 大乐透走势图 大乐透走势图 博牛社区 中国福彩网 脱兔电竞 360彩票网 炸金花 博牛论坛 500万彩票 山东11选5 广东快乐十分走势图 广东11选5走势图 内蒙古快3 彩客网 彩客网 皇冠足球比分 足球彩票 懂球帝 皮皮麻将 福彩3D综合走势图 大乐透复式计算器 凤凰棋牌 天天斗地主 波克棋牌 大神棋牌 欢乐棋牌 黑龙江快乐十分 彩票万能选号器 四人斗地主 王者荣耀赛事竞猜 江苏11选5 足彩胜负14场 篮球论坛 玩加电竞 腾讯棋牌 竞猜网 秒速赛车_永久网址9h123.com - 水立方冰场转换结构上午完工-中新网 秒速赛车_上9号363758.com - 人民网