中山市佑玛电器有限公司

壁挂炉生产厂家

Product

Your current location:

Home >> Product >> Plate in Wall hanging furnace

gas-boilor merchants to join us

  • Detailed

1555394798775590.jpg


1555394806588919.jpg

1555394811446561.jpg

1555394816185703.jpg

1555394817574471.jpg

1555394821127472.jpg


GAS-BOILOR China merchants to join us


Household gas in cb debugging before ignition those prepared to do?


Domestic wall-mounted gas stove is a kind of personalized household independent heating of the heat output device, its heating and heating water two kinds of functions, and a safe, reliable, energy saving, health, environmental protection and convenient use, etc. Is a lot of the pursuit of personality and comfortable family heating choice for heating equipment. Wall-mounted gas furnace installed according to the standard specifications complete, need of wall-mounted gas furnace ignition debugging confirm performance parameters to meet use requirement. So how domestic wall-mounted gas furnace installation debugging? Household gas in cb debugging before ignition those prepared to do? Cb in cb China professional and technical personnel, for everyone to do the standard operation is introduced:


A, a former mode:


The requirements must be met before the equipment debugging, the basic condition that water, electricity, gas, is a must and should meet the specified requirements.


Second, the debugging preparation before ignition operation steps:


1, installation, commissioning, and for the first time the ignition must be conducted by professionals.


2, when home users use gas type, gas pressure, the use of the power supply must be consistent with that of cb, the size of the room and wall hanging furnace power should be matched.


3, check the pipeline and heating water system connection, ensure the machine interface and heating pipe connection is correct.


4, confirm the cb if input voltage is 220 v ~ 50 hz, electrical connection is correct, and have reliable grounding.


5, automatic open the exhaust valve and exhaust valve in the heating system,


Cb 6, open the water inlet valve and the system of water supply and return water pipe on the valve;


7, when water flowed from exhaust valve, close the discharge valve;


8, when the heating cycle system pressure is 0.15 MPa, shut off the water inlet valve wall hanging furnace;


Website:http://en.hzyinyou.com/product/607.html

Case

中山市佑玛电器有限公司The high quality case

  • Service
  • Contact
    13560697509
  • Meeage
  • Welcome
    Please enter your message here。
    Name
    Name
    Tele
    Tele
    mailbox
    mailbox
    address
    address
    篮球比分 ope体育 火红彩票 篮球比分 大乐透走势图 大乐透走势图 博牛社区 中国福彩网 脱兔电竞 360彩票网 炸金花 博牛论坛 500万彩票 山东11选5 广东快乐十分走势图 广东11选5走势图 内蒙古快3 彩客网 彩客网 皇冠足球比分 足球彩票 懂球帝 皮皮麻将 福彩3D综合走势图 大乐透复式计算器 凤凰棋牌 天天斗地主 波克棋牌 大神棋牌 欢乐棋牌 黑龙江快乐十分 彩票万能选号器 四人斗地主 王者荣耀赛事竞猜 江苏11选5 足彩胜负14场 篮球论坛 玩加电竞 腾讯棋牌 竞猜网 秒速赛车_永久网址9h123.com - 水立方冰场转换结构上午完工-中新网 中山市佑玛电器有限公司秒速赛车_上9号363758.com - 人民网